I step on board of this cold metal body, which suddenly, becomes my own.
Trapped in a circulation,
full of rhythm and repetition
I desperately wait for something to break the loop I am in no control to do so myself.
I lay down
but cannot, make out a horizontal line. I try to stand upright,
but fall straight into a slope.
I try to get my body in line
the loop is broken,
and I can feel time move again.
Installation views from MFA show Flowline GALLERY KHM2, 2019 and Edstrandska Foundation Scholarship Exhibition, KHM Gallery, Malmö, Sweden.
Special thanks to Hrafn Guðmundsson at the Icelandic Meterological Office, H-G fisheries company and the Crew aboard Páll Pálsson ÍS-102